Acid Dilution Trough

Acid Dilution Trough

Water Treatment Equipment for diluting acids and other chemicals used in cooling towers
REQUEST MORE INFORMATION

  • Designed to dilute chemicals before they enter the cooling tower water basis.
  • Prevents long term damaging effects to cooling tower basins and equipment if chemicals are not mised properly
  • Chemicals are typically twice as heavy as water, which cause acids to sink to bottom of cooling tower basins
  • Agressive chemicals will attach the concrete, damaging the basin floor and causing the structural support within the basin to erode
How it works
  • The Chemical Dilution Trough mixes re-circulated and make up water to dilute chemicals.
  • The chemical / water solution then travels across a series of PVC or CPVC baffles before entering the cooling tower basins
  • Once in the cooling tower, the diluted solution rapidly disperses within the tower basin water

Benefits of an Acid Dilution System:

  • Drastically reduces chemical damage to cooling tower basin
  • Reduced downtime of tower for basin repair
  • Simple design greatly improves reliability
  • Provides precise chemical control
  • Lowers chemical costs by controlling chemical feed rate

Applications:

  • Sulphuric Acid
  • Sodium Hypochlorite (Chlorine)
  • Corrosion Inhibitor
  • Cooling Tower Dispersant

MICRO Acid Eddy Chemical Dilution Trough

  • Maximum Chemical Flow: 250 GPD
  • Length: 57 in. (end to end)
  • Width: 12 in. (Base of Support Feet)
  • Height: 17 in.
  • Weight: 25 lbs
  • Available Materials: PVC or CPVC

MACRO Acid Eddy Chemical Dilution Trough

  • Maximum Chemical Flow: 500 GPD
  • Length: 90 in. (end to end)
  • Width: 12 in. (Base of Support Feet)
  • Height: 15 in.
  • Weight: 70 lbs
  • Available Materials: PVC or CPVC

MEGA Acid Eddy Chemical Dilution Trough

  • Maximum Chemical Flow: 750 GPD
  • Length: 94 in. (end to end)
  • Width: 12 in. (Base of Support Feet)
  • Height: 15 in.
  • Weight: 160 lbs
  • Available Materials: PVC or CPVC